Do a controlled batch OS upgrades using Provisioning

// Expert user has replied.
K Kjell Lloyd 2 years 10 months ago
4 2 0

Hi  Is it possible to "push out" a batch of OS upgrades to a Site with number of device. For instance let's say you have 200 x MC17 in a store.  During the night the customer want's to upgrade all 200 devices so everything is ready for the next morning. Is there a way to only allow 10 devices simultaneously run the upgrade? I know there are some issues to confirm/verify back to MSP after a OS upgrade but any solutions or ideas is much appreciated.  

Please register or login to post a reply

2 Replies

K Kjell Lloyd

Customer tried this and said it didn't help. Are there anything else that needs to be done, like activate/deactivate the relay server? Not sure if they did the test on MSP 3.2 or 3.3.1 (they have both) need to verify this myself.

V Vedsatx Saddvv

Hi Kjell, this can be done with the "Max. Jobs" parameter available for the relay server configuration.
If set, this field regulates the maximum number of Jobs that may be in progress at any one time on a Relay Server. Thomas

CONTACT
Can’t find what you’re looking for?